House Progress and the dreaded variation #1

I knew it would happen sooner or later. No matter how organised and prepared we were, a variation was going to make its way onto our build contract. At $500 a pop, just to raise the variation, it really has to be justified.

When we did pre-start we tried our best to keep the costs down by making sure most of our upgrades were included at pre-contract stage. However, the electrical changes had to be done at pre-start. I have absolutely no idea about the electrical side of things, or structural for that matter, so this was left to Josh! We added what we thought would be enough and made sure GPO’s (powerpoints) were placed on walls that Josh could then chase later (totally not the right terminology, but I have no clue about any of this…). Fast forward 6 months and after 101 jobs have been added to Josh’s “post handover list” we decided that we may as well add all the electrical we need to ease the amount Josh has to do afterwards. Plus, being a two-storey the lower floor has limited access to the roof space, so we really need to get all of this right at construction stage.

I really wish WA builders would wait until the house is at plateheight before they make you decide on your electrical plan. That way, you would be able to walk through the house and really get an idea where you need everything.

What we added.:

  • pendant light switch height  – I forgot to specify the height we wanted these, so they’re at 1400mm H which looks ridiculous. We’ve moved them down to 900H so they will sit just above our bedside tables.
  • hallway powerpoint – for the vacuum / a lamp on our entry table.
  • powerpoint in garage for power tools (high pressure cleaner for washing cars etc).
  • Front exterior lights.
  • An outdoor light near the clothesline! How will Josh see when he is hanging out our washing?? Haha, just kidding – this will be a pink job for sure.
  • more GPO’s (powerpoints) throughout – I think we added 10 more in total.
  • ceiling fan conduit in the master bedroom – this is a must so we don’t have to use the aircon as often!
  • added conduit and faceplates in the theatre + a GPO on the roof for the projector.

Our variations came to $1800 including the $500 variation fee (OUCH!). But I think we will be glad we spent the money and had everything ready for when we move in.

House Progress:

Here’s a few photos of our build from the camera roll this week.

IMG_8514

Our colorbond was delivered, so I’m hoping for lower roof cover by the end of next week.

IMG_8520

Double Shower – Woohoo! Can’t wait to see all the wet areas complete – I think that will be one of the most exciting parts of the build.

IMG_8516

Kitchen (window splashback) and Scullery / WIP to the left

IMG_8517

Dining / Alfresco

IMG_8521

My favourite part of our house – the huge entry door!

I’ve just realised I haven’t got any photos of upstairs… I will try and get some next week when the lower floor roof is finished.

Advertisements

One thought on “House Progress and the dreaded variation #1

  1. Johanne says:

    Looking good! I think you got away lightly with your electrical variation and you will appreciate the lights and GPOs when you have all the other post-handover work to do.

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s